SSAS Cube Sync Takes Too Much Time

Viewed 67

When I try to sync in SSAS between two servers in same version. It stucks in "Backup Metadata Traversal Finished". Sync doesn't start. It takes 1.5 hours.

When I delete the cube in server and sync again, it takes 5 minutes. I checked the locks, sync step is showing lock type 4. What should I do?

Other cube in same server sync progress takes 5-10 minutes. There is no problem in server.

Thank you.

link

1 Answers

We updated our analysis services version and problem solved.

Related