I'm monitoring the connect time and latency to connect from jmeter machine while running in GUI mode and that is in within acceptable limit.
Should we strictly follow non GUI mode even though I can able to perform load test with GUI mode?
I'm targeting 250 TPS and able to achieve that ..I have increased my memory and monitoring CPU and memory of load generator is below 60%.
Should I go for non GUI mode ?

