Given a weighed, connected and directed graph G=(V,E) with n vertexes and m edges, and given a pre-calculated shortest path distance's matrix S where S is n*n S(i,j) denotes the weight of shortest path from vertex i to vertex j.
we know just weight of one edge (u, v) is changed (increased or decreased).
for two specific vertex s and t we want to update the shortest path length between these two vertex.
This can be done in O(1).
How is this possible? what is the trick of this answer?
