I just need clarification about the definition of the prediction and control horizon in MPC mode in GEKKO. In the examples found online (For example here https://apmonitor.com/do/index.php/Main/TCLabF), a horizon is defined with m.time(), with m our GEKKO model. In MPC mode (IMODE =6), Is this the prediction horizon of the control horizonß?
