I want to know if there is any way to have 2 "manual jobs", in the same stage, and if one is triggered, the second is canceled.
Basically, what I want to do is to have 2 "manual jobs", one for continue my pipeline, and if it is triggered, the pipeline continue and the second "manual job" is canceled.
Or if the second manual job is the triggered, the first manual job is canceled and the pipeline stop.
I tried many thing but it doesn't seem to work and I didn't find topic about this kind of problematic.
