I have a Minizinc program for generating the optimal charge/discharge schedule for a grid-connected battery, given a set of prices by time-interval.
My program works (sort of; subject to some caveats), but my question is about two 'constraint' statements which are really just assignment statements:
constraint forall(t in 2..T)(MW_SETPOINT[t-1] - SALE[t] = MW_SETPOINT[t]);
constraint forall(t in 1..T)(PROFIT[t] = SALE[t] * PRICE[t]);
These just mean Energy SALES is the delta in MW_SETPOINT from t-1 to 1, and PROFIT is SALE * PRICE for each interval. So it seems counterintuitive to me to declare them as 'constraints'. But I've been unable to formulate them as assignment statements without throwing syntax errors.
Question:
- Is there a more idiomatic way to declare such assignment statements for an array which is a function of other params/variables? Or is making assignments for arrays in
constraints the recommended/idiomatic way to do it in Minizinc?
Full program for context:
% PARAMS
int: MW_CAPACITY = 10;
array[int] of float: PRICE;
% DERIVED PARAMS
int: STARTING_MW = MW_CAPACITY div 2; % integer division
int: T = length(PRICE);
% DECISION VARIABLE - MW SETPOINT EACH INTERVAL
array[1..T] of var 0..MW_CAPACITY: MW_SETPOINT;
% DERIVED/INTERMEDIATE VARIABLES
array[1..T] of var -1*MW_CAPACITY..MW_CAPACITY: SALE;
array[1..T] of var float: PROFIT;
var float: NET_PROFIT = sum(PROFIT);
% CONSTRAINTS
%% If start at 5MW, and sell 5 first interval, setpoint for first interval is 0
constraint MW_SETPOINT[1] = STARTING_MW - SALE[1];
%% End where you started; opt schedule from arbitrage means no net MW over time
constraint MW_SETPOINT[T] = STARTING_MW;
%% these are really justassignment statements for SALE & PROFIT
constraint forall(t in 2..T)(MW_SETPOINT[t-1] - SALE[t] = MW_SETPOINT[t]);
constraint forall(t in 1..T)(PROFIT[t] = SALE[t] * PRICE[t]);
% OBJECTIVE: MAXIMIZE REVENUE
solve maximize NET_PROFIT;
output["DAILY_PROFIT: " ++ show(NET_PROFIT) ++
"\nMW SETPOINTS: " ++ show(MW_SETPOINT) ++
"\nMW SALES: " ++ show(SALE) ++
"\n$/MW PRICES: " ++ show(PRICE)++
"\nPROFITS: " ++ show(PROFIT)
];
It can be run with
minizinc opt_sched_hindsight.mzn --solver org.minizinc.mip.coin-bc -D "PRICE = [29.835, 29.310470000000002, 28.575059999999997, 28.02416, 28.800690000000003, 32.41052, 34.38542, 29.512390000000003, 25.66587, 25.0499, 26.555529999999997, 28.149440000000002, 30.216509999999996, 32.32415, 31.406609999999997, 36.77642, 41.94735, 51.235209999999995, 50.68137, 64.54481, 48.235170000000004, 40.27663, 34.93675, 31.10404];"```