I have a copy pipeline set up in Azure Data Factory, which copies everything in Cosmos DB daily to Azure Data Lake. When copying. there is a spike on RU/s. I donot want to increase Throughput.
Anything I can do to lowering the impact? e.g. can I set a limit to the copying pipeline?
