It seems like I have to add 4 tasks to run the same job at 9am, 11am, 2pm, and 4pm. Is there a way to run the same job 4 times with 1 task?
If yes, how do I configure that.
It seems like I have to add 4 tasks to run the same job at 9am, 11am, 2pm, and 4pm. Is there a way to run the same job 4 times with 1 task?
If yes, how do I configure that.