I need some VM’s to start and stop multiple times in a day, but you can only add one start and one stop time per instance schedule.
You can only add an instance to ONE schedule, so you can’t just make two schedules and add the instance to both schedules.
From the Limitations section of the docs:
- Each VM instance can only follow one instance schedule.
But then it also says:
- Each instance schedule lets you have up to one start operation and up to one stop operation per hour.
So that leads me to believe that you can have multiple start/stop times per schedule.
Is there a way to do this? Thanks.
Limitations:

Error Message:
