I have created a streaming job using Azure portal which aggregates data using a day wise TUMBLINGWINDOW. Have attached a code snippet below, modified from the docs, which shows similar logic.
SELECT
DATEADD(day, -1, System.Timestamp()) AS WindowStart
System.Timestamp() AS WindowEnd,
TollId,
COUNT(*)
FROM Input TIMESTAMP BY EntryTime
GROUP BY TumblingWindow(day, 1), TollId
Now that the job has been running and can see it producing output I want to be able to reduce the costs ideally by setting some sort of time scheduling so that the job can run and still produce the same output without being on all the time.
The only real constraint being that the aggregated output at the end of each TUMBLINGWINDOW has to remain the same as if it were running all the time (no impact of stop-starting on output).
This then brings me to my question.
Update: 2021-02-28
Before going into the question another thing that drove me was that through Azure portal you can manually start and stop a job. When you start/restart a job you can set a custom start time for the job/query. With this level of control say I start a job (or have a job running) and then decide to stop it for majority of the day and then turn it on at say
11:30pmeach day with a custom start time of midnight of the current day then it would be able to be on for approx30minbefore it would output the results (yet still to my understanding produce the same aggregation results/effect compared to if it was on the whole day up until that point). This job could then be paused again at00:30am( the next day for which it stays paused for the majority of the day (1380mintotal until11:30pmagain) upon which the same above logic is applied. This way it remains off the majority of the day yet still can produce the same output for each day wise window (correct me if I am wrong in my thinking). The only issue with this to me seems to be the fact someone would have to manually perform this. Thus I was driven to the docs looking for a way to automate this.
Question
How can I start and stop a job in an automated fashion such that the required output would still remain intact but so that the job doesn't have to remain on all the time (like it currently is)?
Does the documentation linked above suffice given the context above, if so what are some possible arrangements for the N minutes (on) and M minutes (off) time variables for this to work?
Is this possible given the scenario that I want to aggregate on a one day TUMBLINGWINDOW window (whereby I want each window to start and end at midnight of each day, as per its default behaviour.)?
Eg
Window start: 2022-02-20 00:00:00 Window end: 2022-02-21 00:00:00 (aggregation performed),
Window start: 2022-02-21 00:00:00 Window end: 2022-02-22 00:00:00 (aggregation performed),
Window start: 2022-02-22 00:00:00 Window end: 2022-02-23 00:00:00 (aggregation performed),
....so on
Thoughts
I found this documentation from Microsoft regarding auto-pausing jobs using a few methods
However came across a paragraph (quoted below) which made me doubtful whether it seems reasonable in my particular use case (TUMBLING 1 day window as described in my question section).
Note
There are downsides to auto-pausing a job. The main ones being the loss of the low latency /real time capabilities, and the potential risks from allowing the input event backlog to grow unsupervised while a job is paused. Auto-pausing should not be considered for most production scenarios running at scale.
Could this method