Finding all cycles in a directed graph

Viewed 266881

How can I find (iterate over) ALL the cycles in a directed graph from/to a given node?

For example, I want something like this:

A->B->A
A->B->C->A

but not: B->C->B

17 Answers

Depth first search with backtracking should work here. Keep an array of boolean values to keep track of whether you visited a node before. If you run out of new nodes to go to (without hitting a node you have already been), then just backtrack and try a different branch.

The DFS is easy to implement if you have an adjacency list to represent the graph. For example adj[A] = {B,C} indicates that B and C are the children of A.

For example, pseudo-code below. "start" is the node you start from.

dfs(adj,node,visited):  
  if (visited[node]):  
    if (node == start):  
      "found a path"  
    return;  
  visited[node]=YES;  
  for child in adj[node]:  
    dfs(adj,child,visited)
  visited[node]=NO;

Call the above function with the start node:

visited = {}
dfs(adj,start,visited)

I was given this as an interview question once, I suspect this has happened to you and you are coming here for help. Break the problem into three questions and it becomes easier.

  1. how do you determine the next valid route
  2. how do you determine if a point has been used
  3. how do you avoid crossing over the same point again

Problem 1) Use the iterator pattern to provide a way of iterating route results. A good place to put the logic to get the next route is probably the "moveNext" of your iterator. To find a valid route, it depends on your data structure. For me it was a sql table full of valid route possibilities so I had to build a query to get the valid destinations given a source.

Problem 2) Push each node as you find them into a collection as you get them, this means that you can see if you are "doubling back" over a point very easily by interrogating the collection you are building on the fly.

Problem 3) If at any point you see you are doubling back, you can pop things off the collection and "back up". Then from that point try to "move forward" again.

Hack: if you are using Sql Server 2008 there is are some new "hierarchy" things you can use to quickly solve this if you structure your data in a tree.

Start at node X and check for all child nodes (parent and child nodes are equivalent if undirected). Mark those child nodes as being children of X. From any such child node A, mark it's children of being children of A, X', where X' is marked as being 2 steps away.). If you later hit X and mark it as being a child of X'', that means X is in a 3 node cycle. Backtracking to it's parent is easy (as-is, the algorithm has no support for this so you'd find whichever parent has X').

Note: If graph is undirected or has any bidirectional edges, this algorithm gets more complicated, assuming you don't want to traverse the same edge twice for a cycle.

There are two steps (algorithms) involved in finding all cycles in a DAG.

The first step is to use Tarjan's algorithm to find the set of strongly connected components.

  1. Start from any arbitrary vertex.
  2. DFS from that vertex. For each node x, keep two numbers, dfs_index[x] and dfs_lowval[x]. dfs_index[x] stores when that node is visited, while dfs_lowval[x] = min(dfs_low[k]) where k is all the children of x that is not the directly parent of x in the dfs-spanning tree.
  3. All nodes with the same dfs_lowval[x] are in the same strongly connected component.

The second step is to find cycles (paths) within the connected components. My suggestion is to use a modified version of Hierholzer's algorithm.

The idea is:

  1. Choose any starting vertex v, and follow a trail of edges from that vertex until you return to v. It is not possible to get stuck at any vertex other than v, because the even degree of all vertices ensures that, when the trail enters another vertex w there must be an unused edge leaving w. The tour formed in this way is a closed tour, but may not cover all the vertices and edges of the initial graph.
  2. As long as there exists a vertex v that belongs to the current tour but that has adjacent edges not part of the tour, start another trail from v, following unused edges until you return to v, and join the tour formed in this way to the previous tour.

Here is the link to a Java implementation with a test case:

http://stones333.blogspot.com/2013/12/find-cycles-in-directed-graph-dag.html

DFS c++ version for the pseudo-code in second floor's answer:

void findCircleUnit(int start, int v, bool* visited, vector<int>& path) {
    if(visited[v]) {
        if(v == start) {
            for(auto c : path)
                cout << c << " ";
            cout << endl;
            return;
        }
        else 
            return;
    }
    visited[v] = true;
    path.push_back(v);
    for(auto i : G[v])
        findCircleUnit(start, i, visited, path);
    visited[v] = false;
    path.pop_back();
}

The CXXGraph library give a set of algorithms and functions to detect cycles.

For a full algorithm explanation visit the wiki.